XNM-VISION

Capital Projects & Asset Management

Project Portfolio & Governance Portal

A consolidated view of every active project — with status, summaries, key dates, document references, and full audit trail. Members-only access.

Sign in to portfolio
14-DAY FREE TRIAL · SUBSCRIPTION REQUIRED THEREAFTER
Contact info@xnm.ca for pricing, licensing, and access inquiries.
Notice of Terms

XNM-VISION™ is the proprietary software of XNM Consulting Inc. All intellectual property in the platform — including source code, design, content structure, and feature set — is owned exclusively by XNM Consulting Inc. and is protected by Canadian and international copyright law. All rights reserved.

Access is granted at XNM's sole discretion and may be revoked at any time, with or without notice and with or without cause. The fact that a user has been granted access on a given day does not entitle them to continued or future access.

Free access is limited to a 14-day evaluation period. Continued use beyond the trial requires an active paid subscription. Subscription tiers, pricing, and terms are available on request.

Unauthorized use is prohibited. Reverse-engineering, decompiling, redistribution, sublicensing, or attempting to bypass access controls is strictly prohibited and may result in immediate revocation of access and legal action.

Encrypted & Access-Controlled
TLS 1.3 AES-256 AT REST TOTP MFA REQUIRED OIDC IdP RBAC (4-TIER)

All data is protected with industry-standard encryption: TLS 1.3 (RFC 8446) for every connection in transit; AES-256 encryption at rest across all storage. Login requires an enterprise OIDC-compliant identity provider credential combined with time-based one-time-password multi-factor authentication (TOTP, RFC 6238) — no SMS fallback, no bypass.

Members can only see content within their authorized tier (Admin / Director / Manager / Coordinator), enforced server-side at every request with per-project, per-folder, and per-file overrides. Every document access — successful or denied — is permanently logged. Members are added by the Administrator only; no self-registration.

Last security review: 2026-05-29 · Underlying infrastructure: Cloudflare (SOC 2 Type II, ISO 27001, ISO 27018, PCI DSS, FedRAMP Moderate)